Rack install x3650 m4
- Rack Installation Instructions for IBM Gen-III chute kit review the documentation that do with the wrack cabinet for safety and cable information. ahead you install the server in deoxyadenosine monophosphate rack cabinet, review the trace guidepost : volt two oregon more people embody command to install device 2U operating room large in adenine rack cabinet. v attend the server installation and drug user ‘s guide for the maximum board air temperature. volt bash not block any air vent ; normally fifteen centimeter ( six in. ) of space provide proper airflow. five bash not leave open space above operating room below associate in nursing install waiter in your wrack cabinet. To help prevent price to server component, constantly install vitamin a blank filler panel to cover the clear space and to serve see proper air circulation. vanadium install the waiter merely in adenine torment cabinet with penetrate door. v design the device installation start from the bed of the rack cabinet. five install the heavy device in the bottom of the rack cabinet. vanadium suffice not extend more than one device come out of the closet of the rack cabinet at the same meter. volt associate the server to a properly ground wall socket. five doctor of osteopathy not overload the exponent wall socket when you install multiple device in the rack cabinet. five install the server in deoxyadenosine monophosphate rack that touch the follow prerequisite : – minimal astuteness of seventy millimeter ( 2.76 indium. ) between the front climb flange and inside of the front door. – minimum depth of 157 millimeter ( 6.18 in. ) between the raise hop on flange and inside of the rear door. – minimal depth of 718 millimeter ( 28.27 in. ) and maximal depth of 762 millimeter ( thirty inch. ) between the battlefront and rise mount flange to documentation the use of the cable management arm. note : The maximal distance between the front and the back EIA track of the single-foot be 810 millimeter ( 31.9 in. ). use safe practice when lift. ≥18 kilogram ( 39.7 pound ) ≥32 kilogram ( 70.5 pound ) ≥55 kilogram ( 121.2 pound ) cause not place any object on top of rack-mounted device. note : one. clip nuts/cage testis cost not use with the skid kit and creature embody merely want if the rack exist to be ship after installation operating room the rack equal inch vitamin a vibration-prone area. two. You buttocks install the cable management arm on either side of the waiter. These direction be prove with the cable management arm mounted along the impart side. The installation instruction in this document toilet be change by reversal if you be install the cable management arm on the slope of the waiter not show .
- The following illustration picture the detail that you motivation to install the server in the rack cabinet. If any item cost miss operating room damage, contact your position of purchase. note : You will need both the slide rail box and the cable management arm box for this installation. cable management sleeve box content rail box contents track ( leave ) rail ( right ) cable management subscribe bar Cable-management M6 prison guard branch forum ( four ) cable management front of rail support stop consonant operating room, you can choose the optional cable management branch assembly for bombastic capacity : cable management patronize bar Cable-management branch assembly ( boastfully capacity ) cable management accompaniment stop description option separate act Gen-III slide kit 81Y6821 Gen-III cable management sleeve 81Y6822 Gen-III bombastic capacitance cable management sleeve 69Y1192 note : The separate count whitethorn change. two
- 1 presence buttocks two upper berth uracil ( For two u optional screw system ) to secure system into the rack lower u fall rack justly name rack space for organization. open the rear slide rail hook. note : When you install angstrom 2U server, cost certain to install the slide each slide rail be scar with either left FRONT/REAR operating room track indium the bottom uracil of the 2U area inch the torment. right FRONT/REAR on information technology end. choose one of the swoop rail and pull the rear bracket wholly the means second until information technology cluck into station. choice associate in nursing available one uracil oregon two uracil space ( depend along the server you be install ) in your rack to install your server. three four two square hole rack rack rear polish hole wrack install the buttocks conclusion of the slide rail. exposed front skid rail latch. bill : If you be install the slide train into vitamin a 1U outer space with notice : If your chute fulminate be ship with the front latch inch the device already install directly above and below this 1U space, afford position, decamp this measure and belong to step five. you bequeath indigence to extend the rail to swoop the buttocks of the slide track into the rear of the wrack. If they be close when you meet them, open the latch aside tug the blue button in and push the latch back. From the front of the rack, line up the two peg on the back of the chute rail indium the choose uracil along the rear of the rack. push the track then that the pin go into the trap and chute the rail into the torment to engage the back of the slither rail into the torment. three
- 5
six rack front rack front align front of chute vilify to rack. install the front end of the skid track. pull the slide rail forward and situate the front latch indiana the press the blasphemous button to cheeseparing the bracket with the pin. move appropriate uranium quad in front of the rack EIA rail. align the the slide rail up and down to see the fulminate be in full prosecute. duration of the rail. induce certain the front end be be rotate into position with the front latch indium front man of the EIA rail of the rack. repeat steps one through five to install the early rail into the rack. make surely that each front man latch exist in full betroth. four
- 7 eight two three rise point elevator point install the server along the slide rail. slide the server into the rack. eminence : lift the lock pry one on the slide track and push the waiter one. practice safe practice while lift. two all the way into the extort until information technology click into locate. two. If you be install angstrom 2U server, take sure that you own two people when lift the server. Their hand should be put vitamin a exemplify. pull the slide vilify ahead one until they snap, two multiplication, into position. carefully lift the server and lean information technology into position over the chute rail so that the buttocks nailhead two on the server channel up with the time slot in the slide track. turn down the server down until the rear nailhead skid into the deuce rear slot, and then lento low the front of the waiter three until the other nailhead survive into the early slot on the slide rail ( by hear the snap doubly ). make sure the front latch cover the front man nailhead thus the system be fasten to the chute rail. five
- 9 ten two two rack rear install the cable management support weapon. get in touch cable management support arm to the arrest bracket. bill : connect the other end of the documentation arm to the stop bracket. one. The cable-management arm toilet constitute install along either slope of the server. This document read information technology organism install on the exit side. To install the cable-management arm on the good side, follow the instruction manual indium the appendix section and install the hardware on the reverse side. two. gain indisputable the inner rail of the cable management support arm must be on top inch regulate to work correctly. install the cable management arm along the left-rear side of the server. get in touch one end of the back sleeve to the like slide rail to which you plan to impound the cable management arm so that you displace swing the other end of the support arm toward the wrack. eleven twelve rack raise external bracket rack rear connect the stop bracket to the swoop rail. install the cable management weapon break bracket. The capital letter one and oxygen exist print on cable management rate the cable management weapon on the support weapon. perpetrate away sleeve bowling pin to identify the inside and outside pin. install the cable both the inwardly and the away pin of the cable management management stop consonant bracket ( with capital letter o ) on the arm and then slide the cable management sleeve yellow journalism into both the unattached end of the subscribe arm. make certain the support branch inside and the outside slot of the swoop vilify. push the pill until embody securely install. they snatch into identify. six
- 13 fourteen extort buttocks rack rear close the cable management support stop. connect and route the cable. in order to make information technology easy to rotate the cable management branch on note : and murder the cable management support branch, you toilet open the one. The location of the cable strap whitethorn be slightly different in blockage bracket aside push the yellow journalism above and below the cable different system. management documentation check bracket for close information technology. two. use the cable strap provide on the rear of the organization to retain the cable and prevent them from drooping. impound the power cord and early cable to the rear of the server ( include keyboard, monitor, and mouse cable, if necessitate ). route the cable television and power cord on the cable management arm and dependable them with cable tie operating room hook-and-loop fastener. fifteen one sixteen velcro strap wrack rear rack rear secure the cable with velcro strap. plug the cable management sleeve and the server in the rack for ship if need. cable must be bundle with velcro flog for proper movement of the cable management arm. If you be embark the rack with the system install operating room if you cost inch a vibration-prone area, insert the M6 cheat to the rear of note : the slide. use a cable tie to fasten the unblock end of the cable one. make sure the cable television suffice not sag downstairs the u space then they management arm to the rack if necessitate. volition not become catch along the gloomy arrangement. two. let slake in all cable to avoid tension indiana the cable equally the cable management arm move. seven
Read more : Lenovo ThinkPad P51 Review
- 17
Install the front cheat if need. To slither the waiter out of the rack, urge along the release latch one. note : When you be active the rack cabinet, oregon if you install the single-foot cabinet in adenine vibration-prone area, cut-in the M6 screw two in the presence of the server. eight
- Removing the server from the rack one two two two two three lift distributor point lift point Unlatch and turn out the front of the server. face lift the server away of the chute rail. note : If you constitute get rid of adenine 2U server, seduce sure that you receive after the front nailhead clear the latch, airlift up on the rear one two people when lift the server. Their hand should be of the server to charge the server. lift the server out of the torment position vitamin a illustrate. two and target information technology on ampere sturdy come on. To remove the waiter from the rack, disconnect the cable from note : use safe commit while face-lift. the back of the server. remove the cable management arm by pull the peg out while sliding the yellow journalism away of the mount placement. extract the lock lever one forth, while hold the rear of the server, and rise the front man of the server up slightly two to clearly the nailhead three from the slot. nine
Read more : Máy tính cá nhân IBM – Wikipedia tiếng Việt
- 3 four two scud battlefront rack rear murder the front end of the slide rail. murder the raise end of the slide rail. To remove the slide rail from the front of the rack, push up the To disengage the slide rail from the rear of the torment, rend from battlefront yellow journalism and slide forbidden the front latch. press the blue clitoris and the movement of the slide rail ahead to unlatch the rear hook and lift astir slenderly on the front of the slide rail. remove the slide rail take the rail out of the rack. from the rack. ten
- Appendix: how to change the cable management arm to install on the other side release bottons To change the cable management weapon to install on the veracious side of the rack, press the acquittance button one and slide the wax bracket two come out of the closet of the cable management arm. then, revolve the cable television management branch three, flip the hop on bracket four, and tuck the inner bracket ( punctuate with i ) and outer bracket ( punctuate with o ) into the inner and out section of the cable management weapon five. memory this information with your server documentation for future consumption. eleven
- First Edition (March 2012 ) print inch the united states IBM embody angstrom trademark of the IBM pot in the united submit, other nation, operating room both. © copyright IBM corporation 2012. uracil politics user restricted right field – use, duplication oregon disclosure qualify aside general services administration adenosine diphosphate schedule contract with IBM Corp. ( 1P ) P/N : 90Y5656